Corporate Pond Construction from Start to Finish

Wisconsin Lake & Pond Resource, LLC is very excited to announce that we are in the process of building our own corporate lined pond at our Eldorado facility.  This pond will serve the purpose of providing customers an opportunity to see all the working components of a sustainable pond in person and provide hands-on demonstrations. 

Click here to watch a collection of images and video of our corporate pond install

101

PB300035

Pond site before Current view of pond site
106 105
Aerial view before Current aerial view of pond site

Week 8 - October 24th

Pond filling progress
Pond filling progress

Pond filling progress
Preparing soil for planing
View of beach area
25
Preparing soil for planting
Beach area
Prev  Set 1/2  Next

Week 7 - October 17th

Placement of stone rip-rap
Placement of stone rip-rap

Placement of stone rip-rap
Placement of stone rip-rap
Placement of stone rip-rap
Placement of stone rip-rap
Placement of stone rip-rap
Placement of stone rip-rap
Prev  Set 1/2  Next

Week 6 - October 10th

Pond filling
Pond filling

Pond filling
Pond filling
Pond filling
Stone prior to placement around pond

Week 5 - October 3rd - Final basin prep and liner installation

Final basin ready for underlayment
Final basin ready for underlayment

Final basin ready for underlayment
Final basin ready for underlayment
Final basin ready for underlayment
Final basin ready for underlayment
Final basin ready for underlayment
Stone shelf
Prev  Set 1/8  Next

Week 4 - September 26th - Alternately titled "Slow progress due to Mother Nature's rain"

Installation of bottom drain system
Installation of bottom drain system

Installation of bottom drain system
Installation of bottom drain system
Installation of bottom drain system
Installation of bottom drain system
Installation of bottom drain system
Future beach area
Prev  Set 1/2  Next

Week 3 - September 19th

Site prep
Site prep

Site prep
Site prep
Site prep
Site prep
Site prep
Site prep
Prev  Set 1/3  Next

Week 2 - September 12th

Week 2 overall progress
Week 2 overall progress

Week 2 overall progress
Beginning of basin
19

Week 1 - September 5th

Site of future pond
Site of future pond

Site of future pond
Installation of silt fence
Setting grade elevations
Setting grade elevations
Initial site prep - removal of top soil
Initial site prep - removal of top soil
Prev  Set 1/2  Next
 